Briefing Room Setup
search
  • Briefing Room Setup
  • Briefing Room Setup
  • Briefing Room Setup
  • Briefing Room Setup
  • Briefing Room Setup
  • Briefing Room Setup

Briefing Room Setup

€115.00
Tax included

ATTENTION: SHIPMENTS WILL BE MADE FROM THE END OF MARCH. PRESALE MATERIAL

Briefing Room Setup" is the set of minimum essential elements that cannot be missing in a briefing room:

- Map 1: 500.000 Poster 176 X 120 cm to be chosen from the three available titles, North, Central South Islands.

- VFR AAI Italy flight manual

- Avioportolano

- 1 copy of the poster "Symbology and classification of Italian air spaces": 50x70 cm

- 2 copies in rolled spread sheet of the Planivolumetric Map of the Italy Aeronaautical Facilities Chart

- 20 copies of the Italy Aeronaautical Facilities Chart in folded sheets in the standard AAI format.

Delivery time: 7/10 working days

Taglio disponibile: Nord
Quantity

ATTENTION: SHIPMENTS WILL BE MADE FROM THE END OF MARCH. PRESALE MATERIAL

Briefing Room Setup consisting of:

- Avioportolano: click here for more information.

- VFR AAI Italy flight manual: click here for more information.

- Map 1: 500.000 Poster 176 X 120 cm for the wall: click here for more information.

- Italy Aeronautical Facilities Chart poster 70x100 cm planivolumetric map: click here for more information.

- Poster "Symbology and classification of Italian airspace" 50x70 cm: click here for more information.

Cartographic base: © AVIOPORTOLANO® srl - UTM 32N projection (central meridian 9 °, origin latitude 32 °).

Standard: ICAO (International Civil Aviation Organization) “International Standards and Recommended Practices - Annex 4 Aeronautical Charts”.

CertificationISO 9001: 2015 - AIS (Air Information Service) issued by Bureau Veritas on 30/11/2019